ONIX codelists Issue 49

Previous versions of the ONIX codelists are still available: Issue 36.

Browse the ONIX codelists, or search for a specific term within the vocabularies.

الرجوع إلى ارشادات البحث بالأسفل‬.

List Code Heading Add Mod ?
166 دور تاريخ الإمداد
يستخدم مع <SupplyDateRole> <x491>
9
166 02 تاريخ الحظر
إذا كان هناك حظر على مبيعات التجزئة قبل تاريخ معين أو التاريخ الذي يتم رفع الحظر فيه و السماح بمبيعات التجزئة
9 43
166 08 التاريخ المتوقع لتوار المنتج
التاريخ الذي يتوقع فيه وجود مخزون فعلي لكي يتم شحنه الى بائعي التجزئة أو توقع طرح المنتج الرقمي
9
166 18 آخر تاريخ للمرتجعات
آخر تاريخ لقبول المرتجعات و عادة ما يكون للمنتج المتبقى منه نسخ أو الذي نفذ من الطباعة
11
166 25 Reservation order deadline
Latest date on which an order may be placed for guaranteed delivery prior to the publication date. May or may not be linked to a special reservation or pre-publication price
17
166 29 Last redownload date
Latest date on which existing owners or licensees may download or re-download a copy of the product. Existing users may continue to use their local copy of the product
38
166 30 Last TPM date
Date on which any required technical protection measures (DRM) support will be withdrawn. DRM-protected products may not be usable after this date
38
166 34 Expected warehouse date
The date on which physical stock is expected to be delivered to the supplier from the manufacturer or from a primary distributor. For the distributor or wholesaler (the supplier) this is the ‘goods in’ date, as contrasted with the Expected availability date, code 08, which is the ‘goods out’ date
41
166 50 New supplier start date
First date on which the supplier specified in <NewSupplier> will accept orders. Note the first date would typically be the day after the old supplier end date, but they may overlap if there is an agreement to forward any orders between old and new supplier for fulfillment
34
166 51 Supplier end date
Last date on which the supplier specified in <Supplier> will accept orders. New supplier should be specified where available. Note last date would typically be the day before the new supplier start date, but they may overlap if there is an agreement to forward any orders between old and new supplier for fulfillment
34

version detail